D.J. Wagner completed the HVAC portion of the new Athletic Pavilion at Cabrini University for Warfel Construction. D.J. Wagner’s scope of work for the installation included, but was not limited to, a new VAV system with hot water reheat in each of the boxes, a Trane 105 ton rooftop unit, a Trane energy recovery unit, gas fired hot water boilers along with pumps as well as all ductwork, hot water piping and accessories. This is another D.J. Wagner project completed on time and budget!