![](https://djwagner.com/wp-content/uploads/2019/03/Burlington-2.jpg)
Complete renovation of the entire HVAC system in a county occupied building. Work included replacement of duct and hot water mains, installation of replacement Boilers, Rooftop equipment, VAV boxes and the addition of a chilled water system to an existing area.